We have gone Solar !

In the summer of 2024, our 10kVA diesel generator seized and became unrepairable by us. A small, second-hand 2.2kVA petrol generator was generously donated, which provided just enough power for lighting, small power tools, and the toilet water pump. Which was only a stop gap as it didn’t give us a sustainable solution.

In May 2026, our Chairman, David Ewers, asked me to look into the possibility of running the entire site on solar power. I calculated that our maximum power requirement, plus a 20% buffer, would be 6kVA. After sending out a Statement of Works to various potential suppliers, we received four options. Two companies conducted site visits, and I ultimately chose Off-Grid Systems due to their superior capacity, guarantees, warranties, and support.

Before installation could begin, workshop roof-beam supports were calculated by Pete Jameson and installed by our Vice Chairman, Pete Snelson. The final project involved replacing six fluorescent classroom lights with energy-efficient LEDs (installed by Carlec) alongside the main photovoltaic (PV) solar installation by Off-Grid Systems. All final costings were approved by LCD; the LED lighting upgrade went ahead on 15 October, followed by the PV installation on 19–20 October 2026.

Our setup now includes 10 solar panels (including one extra panel kindly donated by Off-Grid Systems), a high-capacity 314Ah battery, an 8kVA inverter, an additional, new backup 2.2kVA petrol generator, and a digital control panel that Dave Ewers and I can monitor remotely from our mobile phones.

Many thanks to everyone involved in making this project a success: