In the summer of 2024, our 10kVA diesel generator seized and became unrepairable by us. A small, second-hand 2.2kVA petrol generator was generously donated, which provided just enough power for lighting, small power tools, and the toilet water pump. Which was only a stop gap as it didn’t give us a sustainable solution.
In May 2026, our Chairman, David Ewers, asked me to look into the possibility of running the entire site on solar power. I calculated that our maximum power requirement, plus a 20% buffer, would be 6kVA. After sending out a Statement of Works to various potential suppliers, we received four options. Two companies conducted site visits, and I ultimately chose Off-Grid Systems due to their superior capacity, guarantees, warranties, and support.
We then faced the challenge of raising the required £10,000. The group has launched a fundraising campaign using GoFundMe and other initiatives, which successfully raised a substantial amount, however we still need more ! Around this time, I attended a fundraising course where I learned about “Low Carbon Dorset” (LCD). I completed the application form, and Dr Erik Blakeley from LCD subsequently made a site visit. Although the total amount of carbon we would save was modest, he was impressed by our aims and potential, and chose to support our project. With great assistance from Erik, an amended application was accepted by the Council. We were informed that once the installation was complete and all invoices were paid, half of the total cost would be reimbursed via a grant. To fund the upfront cost, we secured a series of short-term loans from our members which we will pay off with further fundraising activities .
Before installation could begin, workshop roof-beam supports were calculated by Pete Jameson and installed by our Vice Chairman, Pete Snelson. The final project involved replacing six fluorescent classroom lights with energy-efficient LEDs (installed by Carlec) alongside the main photovoltaic (PV) solar installation by Off-Grid Systems. All final costings were approved by LCD; the LED lighting upgrade went ahead on 15 October, followed by the PV installation on 19–20 October 2026.
Our setup now includes 10 solar panels (including one extra panel kindly donated by Off-Grid Systems), a high-capacity 314Ah battery, an 8kVA inverter, an additional, new backup 2.2kVA petrol generator, and a digital control panel that Dave Ewers and I can monitor remotely from our mobile phones.

Many thanks to everyone involved in making this project a success:
- Dr Erik Blakeley (Low Carbon Dorset) for his invaluable guidance and support, and Gary Foot, his colleague.
- Theresa Bailey (Treasurer) for managing and formatting the specific financial documentation required.
- David Ewers (Chairman) for overseeing the corporate, legal, and insurance aspects of the project.
- The Fundraising Team, for their tireless efforts in gathering donations. – Link to our go fund Me though you can just give us cash or a donation to our bank 🙂 .
- Pete Snelson (Vice Chairman) for advising on and preparing the physical site.
- Caroline Brown (MD of Carlec), for updating the classroom lighting.
- Chris Rudge (MD of Off-Grid Systems), for a brilliant and seamless installation.
Author Mike Provart.